Jamshedpur Gold mine

This trial took place over 4 weeks under 60 ft of land with hard rock.

The agenda of excavating minimum 30 tons blast rock over a period of 4 hours with a 0.04cbm bucket was achieved. The machine replaced the manpower and worked for 5 and a half hours. Charging was conducted with direct connection to the grid with a 220v AC supply.

Municipal Corporation Gurgaon

The idea behind the trial was to consider the feasibility of replacing existing 8 ton machinery with 1.2 ton. With a bigger improved 0.06cbm bucket and the work time of 6 hours the objective of reducing traffic congestion due to road blockage with heavy machinery was successfully achieved .

Hammer 1.2

An interesting case study where the customer demanded continuous working operation for 3 hours. We successfully achieved 2 hours before a sudden battery drop. Considering a 1.2 ton machinery the impact during operation is not immense. We concluded the hammer is a crucial attachment for removing cement deposits